Mining and Smelting Combine Bor
Concentrator Majdanpek in Majdanpek started its operation in 1961 (section no. 1) with annual capacity of 3.5 Mtpa, through four crushing circuits that supply the flotation circuit.

Additional capacity was added in the year 1963, which together with the other three crushing circuits and flotation circuit increased the annual capacity to 7 Mtpa.

The next plant (section number 3) was added in 1971, which was organized into the similar configuration as the first section, increased the capacity to 12 Mtpa.

Designing of the “New” flotation plant was commenced in 1989.

The plant was planned to be of the capacity 5 Mtpa, but till today it was not completed.

Concentrator  Majdanpek

Concentrator Majdanpek

Managment Managment
  • Branislav Tomić – Manager