Mining and Smelting Combine Bor
The Bor Concentrator consists of two sections.

Concentrator Bor

Concentrator Bor

The older one was constructed in 1933 and nowadays is being used as a limekiln. The newer part was built in 1974.

In the operating unit there were three sections for comminution of which each has its own circuit. Each section can process 1.25 Mtpa.

Currently there are two working circuits (B and C). The B circuit is used for processing the Jama (underground) ore, and the circuit C is used for slag treatment.

Managment Managment
  • Nebojša Videnović – Manager